Choose a section — the recommendations follow the order of work: preparation, assembling the structures, completion and appendices.
- General provisions
- Purpose and scope
- Main parameters and dimensions of SIPwall panels
- Requirements for stacking and storing the house kit
- General requirements for operating timber houses made of SIP panels
- General requirements for assembling the house kit
- Installing the timber grillage on foundations
- General requirements for assembling floor panels
- Installing floor panels at level 0,000
- Assembling external wall panels of floor 1
- Installing posts and beams inside the house
- Installing the top strapping board
- Assembling internal wall panels of floor 1
- Assembling internal frame walls
- Assembling the intermediate floor
- Installing the bottom plate of walls of floor 2
- Assembling wall panels of floor 2
- Installing posts and beams inside the house
- Installing the top strapping board
- Roof installation
- Assembling a porch or veranda
- Assembling a balcony
- Preparing the roof base
- Appendix No. 3. Method for calculating the fastener consumption needed to assemble a SIP house