From design to a finished house

Terms for building a SIP panel house

We show the whole path clearly: choosing a design, engineering, house kit package, manufacturing, construction and handover.

SIPwall SIP panel house construction
✓
You choose the scope of work you needHouse kit, foundation, assembly, roofing, windows, facade and other services are priced separately.

How we work

Every stage has a clear result. Detailed terms, timelines and costs are set out in the relevant contract.

1

Choosing a design and package

We choose a suitable house and the basic structural system.

2

Approval of changes

We record the required changes and sign the design contract.

3

Design and exact calculation

We issue the design documentation and finalize the scope of the order.

4

House kit contract

We fix the package, the price and the manufacturing procedure.

5

Factory production

We prepare the structural documentation and manufacture the house kit.

6

Acceptance and shipment

The house kit is accepted at the factory and prepared for shipment.

7

House kit delivery

Transport to the site is arranged for the agreed date.

8

Construction and handover

The selected works are carried out on site and the finished result is handed over.

Important: delivery, assembly and additional construction works may be covered by separate contracts. This page shows the general scheme; legally binding terms are taken only from the current contracts.

How we build — on video

Building a SIP panel house and all the stages — from the foundation to the finished home.

Building SIP panel houses2:50
Construction stages: from the foundation to the finished house2:36

Where you can start

You don't need to understand every technical detail in advance — just choose the path that suits you.

✎

Adapt the design to your needs

If you need a different layout, dimensions or architectural solutions, we start with design work.

  • we record your wishes
  • we determine the scope of changes
  • after the design, we prepare an exact calculation
Discuss changes

Choose the structural specification of the house kit

Only the applicable options are shown on the design page.

Luxury

Maximum use of SIP panels in the structure of the house.

  • exterior walls made of SIP panels
  • interior walls made of SIP panels
  • intermediate floor made of SIP panels

Standard

An option for houses with an intermediate floor.

  • exterior walls made of SIP panels
  • framed interior walls
  • framed intermediate floor
Suitable for houses with an attic floor and two-storey houses. This option is not shown for single-storey designs.
Structural elementLuxuryPremiumStandard
Exterior walls made of SIP panels✓✓✓
Interior walls made of SIP panels✓——
Framed interior walls—✓✓
Intermediate floor made of SIP panels✓per design—
Framed intermediate floor——✓
Roof made of SIP panels✓✓✓

Build the construction option that suits you

We don't hide additional works in the overall price. You choose the scope, and a specialist prepares an up-to-date calculation.

Documents and construction help

A short explanation on the page and a link to the full, current version of each document.

⌂

Self-assembly

What the client receives and how to prepare for assembling the house kit yourself.

Learn more →
▧

Album of technical solutions

Appendix No. 2: main details of SIP panel structures.

Open the album →
✓

Technical supervision

Control of the key stages of construction and checking the quality of assembly.

See the terms →
✎

Contract terms

The procedure for design, manufacturing, acceptance, payment and cooperation between the parties.

View the procedure →
⌑

Making changes to the design

The procedure for custom design and approval of layout changes.

Open the procedure →
?

Questions and answers

Frequently asked questions about the technology, packages, foundation, delivery and assembly.

Open the questions →

Frequently asked questions

Short answers that don't overload the page. Details expand on click.

Yes. First the scope of changes is recorded and a design contract is signed. Once the documentation is issued, the final cost of the selected scope is calculated.
The exact scope depends on the chosen structural system and design. The house page shows a short summary; the full specification opens separately and is fixed in the contract.
Yes. Assembly recommendations and an album of technical solutions are provided for this. If needed, you can order technical supervision of the key stages.
Delivery of the house kit to Turkey and customs clearance are already included in the price of the house kit. Assembly, foundation and other works are priced separately for your plot in Gazipaşa, Alanya or Antalya; the final scope is agreed before work begins.
The warranty is 5 years — when the house is fully built, including exterior finishing.
A 70% advance, with the balance paid when the house kit is ready at the factory. The contract is concluded with the Turkish company SIPWALL LTD.