Choosing a design and package
We choose a suitable house and the basic structural system.
We show the whole path clearly: choosing a design, engineering, house kit package, manufacturing, construction and handover.

Every stage has a clear result. Detailed terms, timelines and costs are set out in the relevant contract.
We choose a suitable house and the basic structural system.
We record the required changes and sign the design contract.
We issue the design documentation and finalize the scope of the order.
We fix the package, the price and the manufacturing procedure.
We prepare the structural documentation and manufacture the house kit.
The house kit is accepted at the factory and prepared for shipment.
Transport to the site is arranged for the agreed date.
The selected works are carried out on site and the finished result is handed over.
Building a SIP panel house and all the stages — from the foundation to the finished home.
You don't need to understand every technical detail in advance — just choose the path that suits you.
The fastest start: we pick a house from the catalog and clarify the suitable structural system.
If you need a different layout, dimensions or architectural solutions, we start with design work.
Only the applicable options are shown on the design page.
Maximum use of SIP panels in the structure of the house.
SIP panel outer shell with framed interior walls.
An option for houses with an intermediate floor.
| Structural element | Luxury | Premium | Standard |
|---|---|---|---|
| Exterior walls made of SIP panels | ✓ | ✓ | ✓ |
| Interior walls made of SIP panels | ✓ | — | — |
| Framed interior walls | — | ✓ | ✓ |
| Intermediate floor made of SIP panels | ✓ | per design | — |
| Framed intermediate floor | — | — | ✓ |
| Roof made of SIP panels | ✓ | ✓ | ✓ |
We don't hide additional works in the overall price. You choose the scope, and a specialist prepares an up-to-date calculation.
A short explanation on the page and a link to the full, current version of each document.
What the client receives and how to prepare for assembling the house kit yourself.
Learn more →Sequence of work, storage, installation of panels and structural elements.
Open the recommendations →Appendix No. 2: main details of SIP panel structures.
Open the album →Control of the key stages of construction and checking the quality of assembly.
See the terms →The procedure for design, manufacturing, acceptance, payment and cooperation between the parties.
View the procedure →The procedure for custom design and approval of layout changes.
Open the procedure →Frequently asked questions about the technology, packages, foundation, delivery and assembly.
Open the questions →Short answers that don't overload the page. Details expand on click.
Choose a design or tell us about your goal — a specialist will suggest the next clear step.