Reinforced concrete pile foundation
Piles and strapping; work also went on in the evening.
All confirmed construction stages of this house.
Piles and strapping; work also went on in the evening.
Insulated floor made of 224 mm panels.
Load-bearing walls of 174 mm SIP panels.
Framed partitions according to the design layout.
Floor slab made of 224 mm SIP panels and roof rafters.
Facades, terrace, interior and video of the completed house.
The house was built on the basis of this design.
We will help you choose a design, explain the available specifications and prepare an up-to-date quote.