House based on the “Mistika - S2.8” design, SNT “Kovrovstroy”

Built
Vladimir Region · SNT garden community “Kovrovstroy”
Go to the house design →

How the house was built

All confirmed construction stages of this house.

1

Foundation and sill strapping

Pile foundation and sill frame for the floor of the house.

2

SIP panel floor at elevation 0

Insulated house floor made of SIP panels.

3

Wall assembly

Walls assembled from ready-made, factory-cut SIP panels.

4

Roofing

Roof installation.

House, “Mistika - S2.8” design, SNT garden community “Kovrovstroy”: foundation and base framing1 / 14

Finished house

Facades, terrace, interior and video of the completed house.

House based on the “Mistika - S2.8” design, SNT “Kovrovstroy”1 / 9
Mistika - S2.8
Related design

Mistika - S2.8

The house was built on the basis of this design.

Area68,36 m²Storeys1Rooms3
Go to the house design →

Want a house like this?

We will help you choose a design, explain the available specifications and prepare an up-to-date quote.

Get a quote →