Screw piles, grillage, floor and the start of wall assembly
The SIPwall crew installed the screw piles, assembled a timber grillage for the house and the terrace, installed the SIP panel floor and started assembling the walls.
All confirmed construction stages of this house.
The SIPwall crew installed the screw piles, assembled a timber grillage for the house and the terrace, installed the SIP panel floor and started assembling the walls.