Foundation and sill strapping
Pile foundation with a timber sill frame.
All confirmed construction stages of this house.
Pile foundation with a timber sill frame.
The floor at level 0 and wall assembly from ready-made panels.
Attic floor with SIP panel gables.
The roof and the porch canopy are installed. The roof covering and finishing come next.
Facades, terrace, interior and video of the completed house.
The house was built on the basis of this design.
We will help you choose a design, explain the available specifications and prepare an up-to-date quote.