House based on the “Mistika E” design, Tula Region

Built
Tula Region

How the house was built

All confirmed construction stages of this house.

1

Foundation and sill strapping

Pile foundation and sill frame for the floor of the house.

2

SIP panel floor at elevation 0

Insulated house floor made of SIP panels.

3

Wall assembly

Walls assembled from ready-made, factory-cut SIP panels.

4

Roofing

Roof installation.

5

Interior partitions

Framed partitions according to the design layout.

6

Facade finishing

Otdelka fasada.

House based on the “Mistika E” design, Tula Region: foundation and sill strapping1 / 30

Finished house

Facades, terrace, interior and video of the completed house.

House based on the “Mistika E” design, Tula Region1 / 5

Want a house like this?

We will help you choose a design, explain the available specifications and prepare an up-to-date quote.

Get a quote →