Construction of a country house made of SIP panels, SNT, Ivanovo

Under construction
Ivanovo Region · Ivanovo

How the house was built

All confirmed construction stages of this house.

1

House kit shipment

The house kit has been shipped from the SIPwall factory: factory-cut SIP panels and components. The crew is starting the assembly.

2

Foundation, grillage, floor and ground-floor walls

The SIPwall crew built the pile foundation, assembled a timber grillage from beams, laid the floor and assembled the ground-floor walls from factory-cut SIP panels. Next come the attic floor and the roof.

SIP panel country house, Ivanovo: house kit shipped from the SIPwall factory1 / 11

Kakim budet dom

Rendering and floor plans of the house under construction.

Construction of a country house made of SIP panels, SNT, Ivanovo1 / 4
Small country house
Related design

Small country house

The house is being built to the design with confirmed changes: ground floor — a room, a bathroom with a shower corner and a hall with a straight staircase; a 1,5 × 3 m porch at the end under a single-pitch canopy; attic — one room of 19,9 m²; windows — according to the client’s concept design.

Area51 m²Storeys2Rooms3

Want a house like this?

We will help you choose a design, explain the available specifications and prepare an up-to-date quote.

Get a quote →